Sunday, 30 June 2013

Solar Panels Installed

Week ending the 30 June, saw the Solar panel system installed on the roof. Fantastic really, given I won the system as the major prize at a recent home show. It is a 2.2kw Conergy system in total.

Roof colour:



Tile colour, called 'Wild Rice':


Solar Panels:



Street view of the Solar panels:


Our city views we gave up on subdivision and selling the rear block :(


Sunday, 23 June 2013

Second Story completed!

While we have been away, the builder has been busy! We've come home to have the second story completed and the roof framing done and now tiled! Here are a few pics of the second story (they are a little dark due to the roof being on, and the morning was rainy and overcast). The second story is nowhere near as exciting, other than the kids playroom it's just bedrooms.


Kid's Playroom (I can't wait to set this up!):


One of the kid's bedrooms, they are all roughly the same size, just one with a larger wardrobe:



Kid's Toilet:

 Kid's Bathroom:


Stairwell:


 Main bedroom:

Feature wall in main bedroom:, either side is the walk-in robe behind:


 Walk in Robe behind the feature wall:

Balcony from main bedroom:


View into the main bedroom bathroom. Because of the water I couldn't get in and take pictures of the walk-in-shower: