Sunday 8 December 2013

Week ending 8 December

Lots of finishing touches are happening at the house now. The most exciting part this week is the front door! The front door looks even better than I had imagined:


Close up:


Front door from inside the house:

Wardrobe fit-out:


Internal balustrade is almost installed:




Kitchen appliances have been installed:

 Ovens and Microwave:

Water filter installed on the kitchen tap:



Monday 18 November 2013

Week Ending 18 November - Almost completed front facade

Heaps of photos to show this fortnight with all the different things going in, but the house is really actually looking almost complete.

Front view of house:

View of the Travertine stone feature, constrasting balcony render and balcony. Really happy with the colour and feature choices all those months ago!


Kitchen Glass Splashback Installed:


Black Ceramic Glass Hotplate:




Kitchen Sink and Tap:

Laundry Sink and Tap:



Powder room sink, tapwear and toilet:


Kid's bedroom wardrobes:


Kid's Toilet:


Ensuite sinks, tapwear and mirror:


Ensuite shower, love these tiles:


Ensuite Toilet:


Kid's Bathroom tapwear, sinks & mirror:


Kid's Shower:




Travertine Feature Fireplace. After handover the fireplace framing, and details will all be installed:


Alfresco Ceiling Fans:

Instantaneous Hot Water System, these things are tiny compared to a gas system:


Sunday 3 November 2013

Week ending 3 November: More tiling, cedar installed, benchtops, etc

Last fortnight has seen the most of the tiling completed (they will come back once the fixtures are all installed). All sinks and benchtops put in, and the cedar was installed in ceilings.

Powder Room Benchtop and Sink:


Laundry Benchtop and Sink:

Kitchen Benchtops and sink:

Kid's Bathroom benchtop and sinks:

Ensuite benchtop and sink:

Fireplace framed after install - to be tiled:

Projector ceiling mount:

Cedar lined alfresco:


 Cedar lined Porch:
 Cedar lined Balcony:

Monday 21 October 2013

Wet Area Tiling has started

Week ending 20 October saw the tilers start on the bathrooms, laundry and balcony. The tiles look so much better than what I had imagined. They also poured the Garage and Alfresco concrete slabs, and had the gas fireplace installed to the living.

Garage floor:

Alfresco floor (to be tiled post handover):




Laundry tiling (no feature tiles in here, decided to stick with all white to match the kitchen):

 Powder Room:


Close-up of Powder Feature Tile:

Kid's Bathroom (white walls, chocolate walls and feature tile):


Close-up of Kid's Bath feature tile:

Kid's Toilet (Chocolate wall and floor feature with white walls):
Ensuite:

Mosaic feature on Ensuite Bath Hob:

 Ensuite Shower Feature Wall:


 Fire Heater Installed (Part 1):