Wet Area Tiling has started

Week ending 20 October saw the tilers start on the bathrooms, laundry and balcony. The tiles look so much better than what I had imagined. They also poured the Garage and Alfresco concrete slabs, and had the gas fireplace installed to the living.

Garage floor:

Alfresco floor (to be tiled post handover):




Laundry tiling (no feature tiles in here, decided to stick with all white to match the kitchen):

 Powder Room:


Close-up of Powder Feature Tile:

Kid's Bathroom (white walls, chocolate walls and feature tile):


Close-up of Kid's Bath feature tile:

Kid's Toilet (Chocolate wall and floor feature with white walls):
Ensuite:

Mosaic feature on Ensuite Bath Hob:

 Ensuite Shower Feature Wall:


 Fire Heater Installed (Part 1):


Saturday 12 October 2013

Officially locked-up - Cupboards and storage shelving installed

Week ending 13 October has seen the house reach lock-up stage, and the internal cupboards and storage shelving installed:

Kitchen, looks really white, but once the splashback goes in, walls painted, etc won't be so pristine!

More Kitchen:


More Kitchen:


My fridge and freezer waiting to be installed:

Powder room cabinets (not white but the photo doesn't show the colour properly):

Laundry cabinets (White to match the kitchen):


 Kid's Bathroom Cabinets, bath installed and tilers have screed the floor:


Ensuite cabinets, bath and floor screed:


Internal doors:




Pantry shelving installed:


Upstairs Linen Shelving: