Saturday 12 October 2013

Officially locked-up - Cupboards and storage shelving installed

Week ending 13 October has seen the house reach lock-up stage, and the internal cupboards and storage shelving installed:

Kitchen, looks really white, but once the splashback goes in, walls painted, etc won't be so pristine!

More Kitchen:


More Kitchen:


My fridge and freezer waiting to be installed:

Powder room cabinets (not white but the photo doesn't show the colour properly):

Laundry cabinets (White to match the kitchen):


 Kid's Bathroom Cabinets, bath installed and tilers have screed the floor:


Ensuite cabinets, bath and floor screed:


Internal doors:




Pantry shelving installed:


Upstairs Linen Shelving:
 Downstairs Linen Shelving: