Week ending 13 October has seen the house reach lock-up stage, and the internal cupboards and storage shelving installed:
Kitchen, looks really white, but once the splashback goes in, walls painted, etc won't be so pristine!
More Kitchen:
More Kitchen:
My fridge and freezer waiting to be installed:
Powder room cabinets (not white but the photo doesn't show the colour properly):
Laundry cabinets (White to match the kitchen):
Kid's Bathroom Cabinets, bath installed and tilers have screed the floor:
Ensuite cabinets, bath and floor screed:
Internal doors:
Upstairs Linen Shelving:
Downstairs Linen Shelving:
Kitchen, looks really white, but once the splashback goes in, walls painted, etc won't be so pristine!
More Kitchen:
More Kitchen:
My fridge and freezer waiting to be installed:
Powder room cabinets (not white but the photo doesn't show the colour properly):
Laundry cabinets (White to match the kitchen):
Kid's Bathroom Cabinets, bath installed and tilers have screed the floor:
Ensuite cabinets, bath and floor screed:
Internal doors:
Pantry shelving installed:
Upstairs Linen Shelving:
Downstairs Linen Shelving: