Monday, 21 October 2013

Wet Area Tiling has started

Week ending 20 October saw the tilers start on the bathrooms, laundry and balcony. The tiles look so much better than what I had imagined. They also poured the Garage and Alfresco concrete slabs, and had the gas fireplace installed to the living.

Garage floor:

Alfresco floor (to be tiled post handover):




Laundry tiling (no feature tiles in here, decided to stick with all white to match the kitchen):

 Powder Room:


Close-up of Powder Feature Tile:

Kid's Bathroom (white walls, chocolate walls and feature tile):


Close-up of Kid's Bath feature tile:

Kid's Toilet (Chocolate wall and floor feature with white walls):
Ensuite:

Mosaic feature on Ensuite Bath Hob:

 Ensuite Shower Feature Wall:


 Fire Heater Installed (Part 1):