Sunday, 3 November 2013

Week ending 3 November: More tiling, cedar installed, benchtops, etc

Last fortnight has seen the most of the tiling completed (they will come back once the fixtures are all installed). All sinks and benchtops put in, and the cedar was installed in ceilings.

Powder Room Benchtop and Sink:


Laundry Benchtop and Sink:

Kitchen Benchtops and sink:

Kid's Bathroom benchtop and sinks:

Ensuite benchtop and sink:

Fireplace framed after install - to be tiled:

Projector ceiling mount:

Cedar lined alfresco:


 Cedar lined Porch:
 Cedar lined Balcony:

No comments:

Post a Comment